BICS Eligibility & Compliance
Unlock up to 25% off your electricity costs through the new British Industrial Competitiveness Scheme. The British Industrial Competitiveness Scheme is designed to help eligible UK manufacturers reduce electricity costs. Carbonxgen helps you establish eligibility, prepare robust evidence and secure the strongest exemption your business is entitled to.
With Carbonxgen, you get:

The maximum exemption you're entitled to, not a conservative estimate

An application built to withstand scrutiny, reducing the risk of delay or rejection

An evidence base that supports wider compliance and reporting activities, while helping determine the most appropriate levy exemption route
Not Sure If You Qualify?
Eligibility depends on your sector, your product, and how much of your site's electricity goes towards eligible manufacturing. Check in two minutes.
Why Now Is the Time to Act
The British Industrial Competitiveness Scheme represents one of the most significant opportunities in recent years for eligible UK manufacturers to reduce electricity costs.
Applications are expected to open for a limited assessment window, giving businesses a short period to confirm eligibility, prepare supporting evidence and secure the highest level of relief available.
Preparing now means you can:
- Secure up to 25% off eligible electricity costs
- Position your business to claim a potential rebate for the 2026 to 2027 financial year
- Ensure the evidence supporting your application is complete before the submission window opens
- Maximise the exemption band you’re entitled to, rather than settling for a cautious estimate
- Start reducing long-term electricity cost exposure as soon as the scheme begins
The businesses that prepare early will be best placed to make the most of this new government support.
Who This Applies To
- Manufacturers in IS-8 frontier industries
- Manufacturers in qualifying foundational industries
- Businesses operating in Advanced Manufacturing, Clean Energy, Defence, Digital & Technologies or Life Sciences
- Finance and energy leads responsible for managing electricity cost exposure
If a meaningful proportion of your site’s electricity is tied to manufacturing an eligible product, BICS eligibility sits within your remit.
What the Scheme Requires
BICS exempts eligible businesses from the indirect costs of the Renewables Obligation, Feed-in Tariff and Capacity Market charges.
Core components of the scheme include:
- Sector and product eligibility against published SIC and HS codes
- Site-level calculation of eligible electricity use
- Banded exemption levels based on the proportion of eligible use
- A defined assessment and submission window
- Ongoing compliance, reporting and validation once approved
While the scheme is designed to support more UK manufacturers, securing relief still depends on demonstrating eligibility through robust, well-evidenced submissions within a defined application window.
The Carbonxgen approach
Connecting Eligibility, Evidence and Ongoing Compliance
We manage the entire BICS process from eligibility through to ongoing compliance, so you don’t have to navigate it alone.

Eligibility and classification
We assess your sector and product against the published SIC and HS codes, and check for overlap with EII, CCA or other exemption schemes.

Site-level evidence
We calculate your eligible electricity use at site and meter level, building the case for the strongest defensible exemption band.

Application and submission
We prepare and submit your application, liaising with scheme administrators on your behalf.

Ongoing compliance
We manage your declarations, returns and evidence maintenance once your exemption is in place.

Wider compliance value
We use the evidence gathered to strengthen your position under SECR, ESOS and other reporting obligations.
What Our Service Includes

Sector and product eligibility assessment

Site-level eligible electricity calculation

Banding analysis to support the strongest defensible exemption

Evidence pack preparation

Application submission and administrator liaison

Ongoing compliance, reporting and validation

Integration into wider portfolio compliance frameworks
CarbonXcelerate:
Structured BICS Evidence
This enables:
- Clear visibility of eligible electricity use across your sites
- Ongoing validation of consumption data against your claimed banding
- Centralised evidence ahead of submission and renewal deadlines
BICS is managed as an ongoing compliance obligation, supported by structured data governance rather than a one-off spreadsheet exercise.
What This Delivers

Maximised Relief

Regulatory Confidence
A clear, defensible eligibility and submission position

Reduced Resource Pressure
Application and compliance burden taken off your internal team

Wider Compliance Strength
Long-Term Resilience

Commercial Control
Electricity cost exposure brought under structured oversight
Why Carbonxgen
Protects Maximum Relief:
Reduces Application Risk:
Supports British Business:
Frequently Asked Questions
Who is eligible for BICS?
When does the application window open?
Eligibility assessments are expected to open in October 2026, with a short window to submit before confirmation in early 2027.
What evidence do I need to provide?
Eligibility is determined by sector and product classification, supported by site-level data showing the proportion of electricity used for eligible manufacturing activity.
Book a BICS Eligibility Review
If your business manufactures within an eligible sector, electricity cost exposure may already be reducible. The first step is a structured eligibility assessment.
How much could my business save under BICS?
Can I claim BICS alongside EII or other exemption schemes?
No. Exemptions cannot be duplicated. Businesses already benefiting from EII will need to assess which scheme delivers the greater value before applying.
What happens after my application is submitted?
Applications are reviewed against the published criteria, with confirmation of eligible businesses expected shortly after the assessment window closes.




